China: Anhui Panjing Cement has ordered an upgrade to its production line from KHD and AVIC. The project includes: installing new triple cyclones in conjunction with existing preheater top stage twin cyclones; a partial modification of downcomer duct; installing a new preheater fan; adding optimised and larger dip tubes for the existing cyclones; installing a new Pyrobox type calciner firing system; adding new raw meal pipes for the two lowest cyclone stages; making calciner modification within the existing preheater building; and installing a new kiln drive system. Where possible the project plans to use reuse existing equipment. It is scheduled for completion by January 2022. It follows a previous upgrade at the plant in 2020 – 2021.
Other recent orders that KHD has announced with China-based cement companies include an upgrade to a production line at Hongshi Group’s Lanzhou plant in Gansu province and the installation of NOx-reducing modifications on a 5000t/day clinker production line operated by China United Cement Baoding.