Taiwan Cement commissions energy storage system at Yingde plant in Guangdong

Print this page

China: Taiwan Cement (TCC) commissioned a 107MWh energy storage project at its Yingde plant in Guangdong province in August 2023. Subsidiary NHOA Energy worked on the project that linked the battery storage capacity to a 42MW waste heat recovery (WHR) system and a 8MWp solar photovoltaic unit. It uses lithium iron phosphate batteries supplied by Ningde Times.

The company’s say that the project is one of the largest industrial microgrids in the world. It is intended to provide energy flexibility to the cement plant by using NHOA Energy’s proprietary energy management system to manage peaks in energy demand and acting as a backup for critical equipment to avoid damage caused by sudden blackouts.

The NHOA Energy storage project is expected to store about 46000MWh/yr of electricity and save just under US$3m/yr in electricity costs. The system will also support the Guangdong Provincial Government’s energy storage development policy and be eligible to associated subsidies of over US$350,000/yr.

Giuseppe Artizzu, the chief executive officer of NHOA Energy, said “NHOA Energy’s proprietary energy management system will optimise the generation and consumption profile of the industrial microgrid, while also supporting the regional grid towards its 100% green energy objective, taking the energy transition in the area one step forward in total accordance with NHOA Group’s and TCC’s shared mission of fostering a positive change for the future of our planet.”

Last modified on 27 September 2023

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/16352-taiwan-cement-commissions-energy-storage-system-at-yingde-plant-in-guangdong

© 2024 Pro Global Media Ltd. All rights reserved.