KHD commissions mill at Siam City Cement’s Saraburi cement plant

Print this page

Thailand: Germany-based KHD Humboldt Wedag has reported the successful commissioning of a new Comflex grinding line at Siam City Cement’s Plant 1 in Saraburi. The line replaces two ball mill circuits, maintaining a production capacity of 350t/hr with a 40% lower energy consumption. The Comflex comprises a roller press, RPM18–200/180 static coarse material separator, VS620 static fine material separator, LS8600 system fan, HKSK 236/346 and four product separation cyclones. KHD says that Siam City Cement awarded it the engineering, procurement and construction (EPC) contract because of the system’s low specific power consumption of 13.36kWh/t, compared to over 21kWh/t in the previous system.

Last modified on 29 April 2020

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/10778-khd-commissions-mill-at-siam-city-cement-s-saraburi-cement-plant

© 2024 Pro Global Media Ltd. All rights reserved.