CalPortland signs FLSmidth up for Mojave raw mill project

Print this page

US: CalPortland has awarded a supply contract to FLSmidth for a new raw mill at its integrated Mojave plant in California. The scope of supply includes engineering, equipment and installation of a new OK 48-4 Raw Mill with a Condition Monitoring System and an ECS/ProcessExpert system. The mill is scheduled to be in operation in late 2021. No value for the current order has been disclosed.

“The new OK Raw Mill from FLSmidth will increase reliability and efficiency at our Mojave plant," said Bruce E Shafer, Senior Vice President for Cement Operations at CalPortland. It follows the purchase of a FLSmidth OK Cement Mill at the same plant in 2004. FLSmidth added that as both OK mills at the plant will share the same gearbox design, the unit will be able to streamline maintenance and manage inventory costs by sharing the one spare FLSmidth MAAG WPU-200 assembly.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/10891-calportland-signs-flsmidth-up-for-mojave-raw-mill-project

© 2024 Pro Global Media Ltd. All rights reserved.