Pioneer Cement commissions additional 12MW capacity at coal power plant

Print this page

Pakistan: Pioneer Cement has begun power generation at its upgraded 24MW coal-fired power plant. Link News has reported that the plant previously had a power generation capacity of 12MW.

Last modified on 01 December 2020

URL: https://globalcement.com/news/item/11667-pioneer-cement-commissions-additional-12mw-capacity-at-coal-power-plant

© 2025 Pro Global Media Ltd. All rights reserved.