Beumer secures contract for Lafarge Zement’s Mannersdorf cement plant conveying system

Print this page

Austria: Lafarge Zement has ordered a new conveying system for raw materials and alternative fuel (AF) for its Mannersdorf cement plant from Germany-based Beumer Group. The system consists of two pipe conveyors. The first will be 192m long with a capacity of 22t/hr. While the second will be 87m long and have a conveying capacity of 10t/hr. The lifting heights will be approximately 39m and the maximum angle of inclination will be 15 degrees. The order also includes three buffer bins and a weigh feeder.

The system replaces the cement plant’s pre-existing conveyors, which were seriously damaged in a fire in June 2020. Beumer will be responsible for delivery, installation, engineering and commissioning of the new conveyors. Commissioning is scheduled for mid-April 2021.

Last modified on 24 February 2021

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/12042-beumer-secures-contract-for-lafarge-zement-s-mannersdorf-cement-plant-conveying-system

© 2024 Pro Global Media Ltd. All rights reserved.