ISGEC Heavy Engineering to install two waste heat recovery units at Shree Cement’s Raipur cement plant

Print this page

India: ISGEC Heavy Engineering has won a contract for a double waste heat recovery (WHR) unit installation at Shree Cement’s Raipur cement plant. The Business Standard newspaper has reported that the supplier will install one unit on the plant’s pre-heater exhaust, and the other on the 10,500t/day kiln’s cooler exhaust.

Industrial and green energy boilers business head Vinod Luthra said, “This is indeed a very prestigious order for us and we thank Shree Cement for once again showing confidence in ISGEC's capabilities. This is the second project that ISGEC will be successfully setting up for Shree Cement."

Last modified on 10 March 2021

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/12100-isgec-heavy-engineering-to-install-two-waste-heat-recovery-units-at-shree-cement-s-raipur-cement-plant

© 2024 Pro Global Media Ltd. All rights reserved.