Heidelberg Cement India to set up US$27.8m waste heat recovery power plant

Print this page

India: Heidelberg Cement India has received approval to set up a waste heat recovery (WHR) power plant at its clinker plant at Narsingarh, Damoh District in Madhya Pradesh. The proposed plant will produce approximately 12.15MW of power from the available waste heat of pyro-processing system of all three lines at the unit. The project cost is estimated to be in the range of US$26.9m to US$27.8m and it is expected to be operational in January 2015.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/1438-heidelberg-cement-india-to-set-up-us$278m-waste-heat-recovery-power-plant

© 2024 Pro Global Media Ltd. All rights reserved.