Ssangyong Cement orders equipment from KHD for Donghae plant

Print this page

South Korea: Ssangyong Cement has ordered equipment from Germany-based KHD Humboldt Wedag as part of an upgrade to clinker production line five of the Donghae plant. The scope of supply for the contract includes: a Pyroclon R type calciner with Pyrotop mixing chamber; a Pyrorotor type alternative fuel combustion reactor; a Pyrobox type coal firing system for process start-up and operation balancing; replacement of stage four cyclones with new high-efficiency cyclones for calciner connection and an overall pressure drop reduction; a new kiln inlet chamber with orifice, kiln hood and tertiary air ducts; and a new Pyrofloor PFC 738AW type cooler with a Pyrocrusher PRC 420-4ES.

This project will be the fourth Pyrorotor installation at the Donghae plant. KHD’s scope includes the engineering and supply of mechanical equipment for the clinker production as well as electrical equipment for the overall modernisation of the production process. The project scope is the same as the modernisation contract of line four of Donghae plant, which was signed in February 2021 and currently is in commissioning. The commissioning of the modernised line five is scheduled for the fourth quarter of 2023.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/14565-ssangyong-cement-orders-equipment-from-khd-for-donghae-plant

© 2024 Pro Global Media Ltd. All rights reserved.