UBE to install US$52.1m waste heat recovery generator by 2015

Print this page

Japan: UBE Industries plans to install a generator powered by waste heat at its cement plant in Kanda, Fukuoka Prefecture. The generator will meet about 40% of the plant's electric power consumption reducing production costs. The US$52.1m project will start providing power as early as the second half of 2015.

The Kanda plant currently produces 11% of its own electricity using a diesel generator. UBE's decision follows similar schemes at UBE's two other domestic cement plants in Japan. The company previously put off this upgrade because of a lull in domestic demand for cement. UBE is acting now because Kyushu Electric Power Co. is preparing for a rate increase in April 2013 that will impact upon production costs.

Last modified on 13 March 2013

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/1502-ube-to-install-us$521m-waste-heat-recovery-generator-by-2015

© 2024 Pro Global Media Ltd. All rights reserved.