Cementa running trials on pilot water treatment plant at Slite

Print this page

Sweden: Cementa is running trials on a pilot water treatment plant in the File Hajdar limestone quarry near its Slite cement plant in Gotland. The pilot plant has been running since September 2022 and the subsidiary of Germany-based Heidelberg materials describes the first results as ‘promising.’ The cement company plans to build and pay for a full-scale water treatment plant at the site. Engineering and design company AFRY has been collaborating with Cementa on the project.

Matilda Hoffstedt, the manager of the Slite cement plant, said “We can contribute to greatly strengthening the public water supply here in northern Gotland. The results from the pilot project are extremely promising and we see that a new water plant would really make a difference to the water supply throughout the year.”

Cementa started work on the water project in 2021 with a feasibility study and plans for the pilot. The entire feasibility study is expected to be completed in the summer of 2023 and the goal is to be able to put a full-scale water plant into operation in 2027. However, Cementa says that it needs a long-term permit for its mining operations in Gotland in order to invest in the project. The cement producer has faced opposition to renewing its permit at the site since 2021. A perceived threat to the area’s drinking water supplies has been a repeated concern made by groups against continued quarrying in the area.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/15218-cementa-running-trials-on-pilot-water-treatment-plant-at-slite

© 2024 Pro Global Media Ltd. All rights reserved.