Algeria: Germany's Gebr. Pfeiffer SE has won a contract through the Chinese General Contractor CBMI to supply a MVR 6700 C-6 type cement mill and a MVR 6000 R-6 raw mill, both of which will be installed at the Lafarge cement works situated near the Algerian town of Biskra. The cement mill is the second-largest in the world after a mill supplied by Gebr. Pfeiifer to Holcim's Barosso plant in Brazil.
The cement mill, featuring Gebr. Pfeiffer's MultiDrive® concept with an installed total drive power of 9125kW, will produce 231-342t/hr of OPC ground to a product fineness of 3700-4800cm²/g according to Blaine.
The raw mill, which will come equipped with a conventional drive with an installed power of 6120kW, is designed to grind 680t/hr of cement raw material to a finished product fineness of ≤12% R 90 µm and 460t/hr of limestone to a product fineness of ≤1% R 150µm.
The delivery of the mills is expected in the summer of 2015.