Loesche signs order for three mills for Thanh Thang Cement

Print this page

Vietnam: Loesche has signed a contract with Sinoma-NCDRI for three mills to be supplied for Thanh Thang Cement in Bong Lang, Ha Na. A type LM 60.6 Loesche mill with a performance of 520t/hour as a reliable unit has been ordered to grind cement to a fineness of 12% R DIN 0.09mm. The gearbox of this mill has a power output of 4600kW. Two separate type LM 53.3+3 CS Loesche mills with a performance of 200t/hour will be in use to grind clinker to 3400 Blaine. The gearboxes of these two mills each have a power of 4,600 kW.

The scope of delivery for this order also includes rotary feeders, water injection, metal detectors and sealing air fans. All three mills are to be put into operation by October 2016.

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/4842-loesche-signs-order-for-three-mills-for-thanh-thang-cement

© 2024 Pro Global Media Ltd. All rights reserved.