LafargeHolcim Kujawy cement plant in Poland to have chlorine bypass system upgraded by A Tec

Print this page

Poland: LafargeHolcim has awarded a contract to A Tec to upgrade the chlorine bypass system at its Kujawy cement plant. A Tec will upgrade its existing Reduchlor bypass system to increase the rate to 10% from 5%. The upgrade will retain the system’s existing bypass filter and filter fan. The project will be commissioned in spring of 2017.

A Tec’s Reduchlor bypass system consists of a take-off chamber above the kiln inlet, specifically designed for each installation, and a specially designed quenching chamber, to which the chlorine condenses on and adheres to fine dust particles. After this condensation process the chlorine-enriched material is collected in a filter.

Last modified on 22 February 2017

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/5817-lafargeholcim-kujawy-cement-plant-in-poland-to-have-chlorine-bypass-system-upgraded-by-a-tec

© 2024 Pro Global Media Ltd. All rights reserved.