Vicem Hoang Thach Cement orders mill from Loesche

Print this page

Vietnam: Vicem (Vietnam Cement Corporation) Hoang Thach Cement has ordered a type LM 59.3+3 CS vertical roller mill for the Hoang Thach cement plant in Hai Duong province. The mill has a transmission power of 6200kW and it is able to grind 250t/hr of Ordinary Portland Cement (OPC) to a fineness of 3600 Blaine. Commissioning is scheduled for later in 2018.

The scope of supply also includes an external reject system, dedusting equipment, a material conveying system and multi-chamber silos with two packaging systems downstream. The system is equipped with a LOMA LF20 heater run on heavy oil, which produces around 30,000Nm3/hr of hot gas at a temperature of 450°C. In addition, Loesche is supplying the equipment for the power supply and distribution and the grinding plant control. A particular challenge of the project has been supplying new equipment for an existing plant with limited space.

Last modified on 28 February 2018

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/7169-vicem-hoang-thach-cement-orders-mill-from-loesche

© 2024 Pro Global Media Ltd. All rights reserved.