Denmark/US: FLSmidth has been awarded a contract worth approximately US$136m by an un-named customer in the US for the modernisation of its cement production facility.
The purpose of the engineering, procurement and construction project is to convert one of the plant's existing wet process kilns to a dry preheater/precalciner kiln. As a result, the customer will be able to better fulfil its key environmental objectives, namely reduction of emissions and achieving lower energy consumption.
The equipment includes an FLSmidth drier crusher, modification of the existing kiln, a new 1-stage preheater with calciner, a kiln bypass system, an FLSmidth Cross-Bar cooler, a coal dosing system by FLSmidth Pfister and an ATOX solid fuel mill with an FLSmidth MAAG Gear reducer.
With the installation of three new FLSmidth fabric filters, the project will significantly improve the plant's ability to reduce the particulate emissions. Similarly, an FLSmidth control system will optimise operational efficiency. The scope of supply also includes a new HOTDISC reactor that will allow the plant to increase its consumption of whole car tyres, thus increasing its use of alternative fuels.
FLSmidth said that the award of this contract demonstrates the company's ability to help US cement producers prepare for the anticipated National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations. "The United States cement industry is facing a number of challenges, ranging from a slowly recovering economy to significant regulatory changes in plant emission standards. We are very pleased to work with one of our much valued customers as it takes a leading role in investing in the future of this industry," said Group CEO Jørgen Huno Rasmussen. The order will contribute beneficially to FLSmidth's earnings until mid 2014.