Power Cement completes installation of machinery on third production line at Nooriabad plant

Print this page

Pakistan: Power Cement says it has completed the procurement and installation of machinery on the new third production line at its Nooriabad plant. This includes a 2.46Mt/yr clinker line and a 2.72Mt/yr cement and dispatch line. The equipment was ordered from Denmark’s FLSmdith. The cement producer says the upgrade has made it the largest in southern Pakistan with a total clinker production capacity of 3.42Mt/yr and a cement capacity of 3.73Mt/yr.

Last modified on 10 July 2019

URL: https://globalcement.com/news/item/9502-power-cement-completes-installation-of-machinery-on-third-production-line-at-nooriabad-plant

© 2019 Pro Global Media Ltd. All rights reserved.