India: ISGEC Heavy Engineering has received an order from Shree Cement to supply a waste heat recovery (WHR) unit for the integrated 3.8Mt/yr Nawalgarh plant in Rajasthan. The scope of work includes design, manufacture and supply of the system. The supplier says that this will be one of the world’s largest steam-based WHR units by capacity. ISGEC previously supplied two WHR units for Shree Cement’s Raipur plant.

ISGEC Heavy Engineering to supply waste heat recovery unit for Shree Cement’s Nawalgarh plant
URL: https://globalcement.com/news/item/13800-isgec-heavy-engineering-to-supply-waste-heat-recovery-unit-for-shree-cement-s-nawalgarh-plant
© 2025 Pro Global Media Ltd. All rights reserved.