ISGEC Heavy Engineering to supply waste heat recovery unit for Shree Cement’s Nawalgarh plant

Print this page

India: ISGEC Heavy Engineering has received an order from Shree Cement to supply a waste heat recovery (WHR) unit for the integrated 3.8Mt/yr Nawalgarh plant in Rajasthan. The scope of work includes design, manufacture and supply of the system. The supplier says that this will be one of the world’s largest steam-based WHR units by capacity. ISGEC previously supplied two WHR units for Shree Cement’s Raipur plant.

URL: https://globalcement.com/news/item/13800-isgec-heavy-engineering-to-supply-waste-heat-recovery-unit-for-shree-cement-s-nawalgarh-plant

© 2025 Pro Global Media Ltd. All rights reserved.