Vinh Tan 1 coal-fired power plant supplies 811,000t of slag and ash to cement plants in first nine months of 2023

Print this page

Vietnam: Cement producers received 811,000t of boiler slag and fly ash from the Vinh Tan 1 coal-fired power plant in Binh Thuan during the first nine months of 2023. This corresponds to 74% of the volume of the by-products generated at the plant during the period. Việt Nam News has reported that the nearby Vinh Tan 4 coal-fired power plant also ‘almost entirely’ avoided waste in the same way. The Vinh Tan 1 coal-fired power plant ended the period with 4.3Mt of ash and slag in stockpiles, while the neighbouring Vinh Tan 2 Thermal Power Plant had 7Mt.

The provincial government of Binh Thuan Province has lobbied the Ministry of Construction to review and adjust current requirements around HDPE liner use, water quality testing and radiation safety in order to facilitate the use of boiler slag and fly ash in cement and other construction products.

Last modified on 01 November 2023

Register for the Global Cement Weekly email newsletter

Global Cement Weekly is Global Cement’s weekly email newsletter. Keep up to date with cement industry news, analysis, diary dates and news of people in the sector.

Register >

URL: https://globalcement.com/news/item/16494-vinh-tan-1-coal-fired-power-plant-supplies-811-000t-of-slag-and-ash-to-cement-plants-in-first-nine-months-of-2023

© 2024 Pro Global Media Ltd. All rights reserved.