KHD to upgrade Thomas Zement grinding plant in Erwitte

Print this page

Germany: KHD has been awarded a contract to upgrade Thomas Zement’s grinding plant in Erwitte. The engineering, procurement and construction (EPC) contract includes process, mechanical, electrical and civil engineering services.
Mechanical and electrical equipment supply includes a roller press for raw material grinding, a static v-separator, an SKS dynamic separator and a KHD HKF process fan.

The deal also includes structural steel supply, erection and installation services for mechanical and electrical equipment as well as structural steel and supervision services for erection, installation and commissioning. KHD is also responsible for the tie-in of the new equipment to the existing raw material and product transport, as well as gas handling and treatment systems.

The erection and installation of the new grinding plant will be carried out during operation of the production line followed by a minimal possible switch over period. No value for the deal has been disclosed.

Last modified on 24 October 2018

URL: https://globalcement.com/news/item/8226-khd-to-upgrade-thomas-zement-grinding-plant-in-erwitte

© 2025 Pro Global Media Ltd. All rights reserved.