HeidelbergCement resurfaces German motorway with low-alkali cement concrete

Print this page

Germany: HeidelbergCement has reported the successful resurfacing of a section of Federal Motorway 5 (BAB 5) between Karlsruhe and Frankfurt using a concrete made from low-alkali cement produced at its 1.4Mt/yr-capacity Schelklingen, Baden-Württemberg integrated cement plant. The company used over 3600t of cement to produce the 12,000m3 of concrete required for the 3.2km stretch of road. Traffic infrastructure product manager Klaus Felsch said, “The cement’s low alkali content significantly reduces the risk of an alkali-silica reaction and maximizes the durability of the concrete.”

Last modified on 15 July 2020

URL: https://globalcement.com/news/item/11077-heidelbergcement-resurfaces-german-motorway-with-low-alkali-cement-concrete

© 2025 Pro Global Media Ltd. All rights reserved.