Displaying items by tag: Dal Engineering Group
Cosmos Cementos completes cooling system upgrade at Toral De Los Vados cement plant
28 February 2024Spain: India-based Nasequip Systems says that it has successfully commissioned a new dual fluid gas cooling system at Cosmos Cementos’ Toral De Los Vados cement plant. The supplier said that the upgrade will help to increase productivity and efficiency. It thanked Türkiye-based DAL Engineering for selecting its equipment.
Dal Machinery & Design delivers new mill and drive to Holcim Azerbaijan’s Garadagh cement plant
04 July 2022Azerbaijan: Turkey-based Dal Machinery & Design has successfully delivered a ball mill and drive set to Holcim Azerbaijan’s Garadagh cement plant. The supplier says that the equipment will serve cement grinding operations at the plant.
North Africa: Turkey-based DAL Engineering Group has announced that it has acted upon a contract to design and manufacture a ball mill for a grinding plant project. It shipped the 3.0m x 10m mill to a grinding plant in North Africa in June 2020.
Tanzania: Turkey-based DAL Engineering Group has reported the successful delivery of three kiln shells to Germany-based HeidelbergCement subsidiary Tanzania Portland Cement’s integrated Wazo Hill cement plant near Dar Es Salaam. Tanzania Portland Cement produces the Twiga brand of cement across the 2.0Mt/yr plant’s three dry lines.
Dal Machinery & Design wins kiln shell order from LafargeHolcim Algeria’s Oggaz cement plant
12 June 2019Algeria/Iraq: Dal Machinery & Design (DMD), part of Turkey’s Dal Engineering Group, has been awarded a contract to supply a kiln shell to LafargeHolcim Algeria’s Oggaz cement plant. The shell has an internal diameter of 5mm. The shell will be manufactured from a single part, with one single welding in the axial direction. It is expected to be delivered by September 2019. No value for the order has been disclosed.
Other recent orders for DMD include the supply of two kiln shells for LafargeHolcim’s Bazian cement plant at Sulaimani in the Kurdistan region of Iraq. The kiln shells were manufactured with a diameter of 5.2m. Delivery was made at the beginning of March 2019. DMD’s other kiln shell clients in Iraq included the Gasin cement plant in 2018. It also supplied a mill tunnion to LafargeHolcim’s Kerbala cement plant.
Egypt/Qatar/Russia/Turkey: Dal Engineering Group has released information about recent project from its Dal Teknik Makina subsidiary in Russia, Egypt and Qatar. In Russia Dal Teknik Makina is currently converting a production line at Eurocement’s Zhigulovskiye Stroymaterialy plant in Samara to manufacture white cement. The project started in November 2018.
In Egypt Dal Teknik Makina conducted a technical audit for HeidelbergCement’s Helwan Cement plant in February 2019. It was carried out on clinker production line one. In Qatar Dal Teknik Makina was awarded a contract in February 2019 to install a pilot scale plant for a calcium sulfoaluminate clinker production line. Dal’s engineers will evaluate the concept and identify the possible problems with operation, and supply the complete engineering and instrumentation for the whole project.