Displaying items by tag: Sinoma Energy Conservation
Saudi Arabia: Riyadh Cement Company awarded a US$34.8m contract to China-based Sinoma Energy Conservation to install a waste heat recovery (WHR) plant at its 3.7Mt/yr Riyadh cement plant. The installation will have a power generation capacity of 12.6MW.
Head of Sinoma Energy Conservation Ma Mingliang dies
24 November 2021China: Ma Mingliang, the chairman and president of Sinoma Energy Conservation, has died at the age of 57. He was reportedly taken ill whilst on a business trip to Zhaotong City in Yunnan Province. Ma Mingliang was a trained engineer who worked for China Triumph International Engineering from 1997 to 2006 before later becoming the chief engineer of the foreign department of China National Building Material (CNBM) International Engineering from 2006 to 2007. Subsequently he held a number of senior positions within CNBM group eventually leading Sinoma Energy Conservation, the subsidiary of CNBM responsible for manufacturing waste heat recovery (WHR) systems.
Pakistan: DG Khan has signed a deal with Sinoma Energy Conservation for upgrades at the integrated Hub cement plant in Baluchistan. The agreement includes a 10MW waste heat recovery (WHR) unit and a 30MW coal power plant. No cost of the project or date of completion has been disclosed.
Sinoma signs waste heat power plant deal with Asia-Africa Business Management in Namibia
03 January 2018Namibia/China: Sinoma Energy Conservation has signed a contract with China’s Asia-Africa Business Management (AABM) to build a 4.5MW waste heat power plant. The power unit will support a 2500t/day cement production plant that AABM and local company Whale Rock Cement plan to build as a joint venture. The cement plant project was first announced in 2015.
Philippines: APO Cement Corporation, a subsidiary of Cemex Philippines, has ordered a 4.5MW waste heat recovery unit from China’s Sinoma Energy Conservation. Sinoma will build and operate it. The new unit is expected to reduce the negative effects of power cuts, save energy costs and reduce the cement plant’s carbon emissions. No delivery date or cost of the order has been disclosed.