Argentine capital posts best first seven months since 2012 despite national malaise

Print this page

Argentina: Cement production in the province of Buenos Aires rose by 11% year-on-year between January and July 2023, to reach 4.18Mt. This was the highest first seven-month figure since 2012.

However, the capital was not representative of the wider national picture. Across Argentina, consumption fell by 0.3% year-on-year over the seven months to 7.22Mt. Production fell by 0.7Mt to 7.25Mt over the same timeframe.

URL: https://globalcement.com/news/item/16256-argentine-capital-posts-best-first-seven-months-since-2012-despite-national-malaise

© 2025 Pro Global Media Ltd. All rights reserved.