Turkey: Shanghai Triumph Energy Conservation Engineering Co Ltd has won a waste heat recovery (WHR) project at Bartin Çimento from Turkey’s Sanko Holding, which operates the plant. It will have a recovery capacity of 5MW from the 3700t/day facility. The project will be carried out on an Engineering, Procurement and Construction (EPC) basis.
Shanghai Triumph plans to install two boilers and one power generation system. It will use two boilers from Mitsubishi Corporation, with the power generator likely to be sourced from Kubota Corporation.