Saudi Arabia: Sinoma Overseas Development has reported the successful construction of the first steel column for the kiln inlet of the new Line 3 at Yamama Cement’s Al Kharj cement plant in Northern Halal. The China-based supplier used a crawler crane to position the structural element, which is painted in its characteristic blue. In a post to LinkedIn, it said that the development ‘kicks off the steel construction and installation’ of the upcoming 12,500t/day (4.6Mt/yr) line.
Sinoma Overseas Development said “Meticulous preparations were made for the successful completion of the first installation as a landmark task in the project’s construction: civil engineers re-measured pre-embedded bolts multiple times, cleared pathways, and set the area ready for operation. Seamless coordination between commanders and operators, combined with whole-process supervision of managers, made the successful installation of the first steel column possible.” Looking forwards, it said “The project team, greatly inspired by the successful installation, will continue to face challenges head-on, chase for high quality while ensuring safety and make sure tasks are completed in due time for the safe and smooth operation of subsequent construction.”