Egypt: Redecam says it has successfully started up a project one line two at Lafarge Egypt’s Ain Al-Sokhna cement plant. The upgrade consisted of: converting the main kiln’s electrostatic precipitator (ESP) into a bag filter; enhanced the cooling system for the clinker cooler, including a partial ESP retrofit; and revamping the bypass the gas conditioning tower and dust transport system. The Italy-based engineering company previously carried out a similar project on line three at the plant in 2020.
