Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Schwenk Latvija trials carbon capture at Brocēni cement plant

Schwenk Latvija trials carbon capture at Brocēni cement plant

Written by Global Cement staff 12 January 2024
  • Print

Latvia: Schwenk Latvija plans to build a 750,000t/yr carbon capture system at its 2Mt/yr Brocēni cement plant. The producer has hired Norway-based Capsol Technologies to conduct a CapsolEoP carbon capture feasibility study at the plant. Schwenk Latvija is a member of the CCS Baltic Consortium, which achieved provisional inclusion on the European Commission’s list of Projects of Common Interest in November 2023.

Schwenk Northern Europe CEO Reinhold Schneider said “Checking the best carbon capture methods and how they can be integrated with our production process is a crucial task for us on the way to carbon neutrality, and likely the major investment direction for the coming decade. To that end, we are excited to investigate the energy consumption and the scale of equipment required for carbon capture at the Brocēni plant, if potentially partnering with Capsol for this challenge.”

Capsol Technologies CEO Jan Kielland said “We are excited to work with Schwenk, one of the most innovative building materials producers in Europe, which has constantly improved its processes to reduce emissions since operations started at the Brocēni plant’s new kiln line in 2010” He added “With this feasibility study, we are taking another step towards building a position as the preferred carbon capture technology provider for cement.”

Capsol’s project pipeline includes 10 large-scale cement projects in the sales engineering and engineering studies phase. The total CO2 capture capacity of these projects is 11Mt/yr.

Last modified on 17 January 2024
Published in Global Cement News
Tagged under
  • Schwenk Zement
  • Latvia
  • Schwenk Latvija
  • CO2
  • Sustainability
  • carbon capture
  • CCS
  • pilot
  • Capsol Technologies
  • Trial
  • CCS Baltic Consortium
  • European Union
  • European Commission
  • GCW642
  • CCUS
  • decarbonisation

Related items

  • AFCM launches first regional cement decarbonisation roadmap
  • Germany approves underground CO₂ storage framework
  • Carbon8 Systems enters administration
  • Paebbl achieves a total of 2500 hours of operation at CO2-sequestering cementitious materials plant
  • Lafont questioned as Islamic State financing trial begins
back to top
We Move Industries - Heko Group - Conveyor Solutions
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.