Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Continental conveyor belts used in Swedish road project

Continental conveyor belts used in Swedish road project

Written by Global Cement staff 23 January 2019
  • Print

Sweden: Conveyor belts supplied by Germany’s Continental are being used in the Förbifart Stockholm road infrastructure project. HeidelbergCement’s aggregate company Jehander is using Continental steel cord conveyor belts at its Löten quarry near Stockholm to allow rubble from tunnelling to be reused for road construction. In addition, drilling machines from Epiroc are using Continental DrillMaster tyres to provide high cut resistance, good traction and stability.

Overall, around 5.5Mt of rock will be extracted to build the tunnels required for the new bypass. A series of conveyor belt systems are being used to transport the extracted rock to three temporary ports that have been set up for the project. The rubble is taken across the waterways by inland vessels from the construction site in Stockholm to Löten. The rubble is then reused as concrete, mostly for road construction, or it used for local construction.

Last modified on 23 January 2019
Published in Global Cement News
Tagged under
  • Sweden
  • Aggregates
  • concrete
  • Infrastructure
  • Roads
  • HeidelbergCement
  • Continental
  • Conveyor
  • Epiroc
  • drilling
  • Tyres
  • Quarry
  • GCW388

Related items

  • Alpacem to build plant for use of alternative raw materials in cement at Wietersdorf site
  • Nigerian cement market to reach US$1.44bn in 2025
  • KTU develops cement additive from discarded textiles
  • Ebonyi governor unveils US$604m budget with plans for new state cement plant
  • Paebbl achieves a total of 2500 hours of operation at CO2-sequestering cementitious materials plant
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.