Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News CalPortland commissions new cement mill at Oro Grande cement plant

CalPortland commissions new cement mill at Oro Grande cement plant

Written by Global Cement staff 27 March 2019
  • Print

US: CalPortland has commissioned a new cement grinding mill and distribution system at its Oro Grande cement plant in California. The US$58.5m project includes the construction of the finish ball mill and two new cement shipping lanes with two new distribution silos. It completes a partial plant modernisation program that was originally completed in 2008, prior to the acquisition of the facility by CalPortland. The Oro Grande cement plant was purchased from Martin Marietta Materials in mid-2015.

“The addition of this modern finish mill and efficient distribution system allows the plant to operate to the best in class standards as originally designed. It will help provide the industry with the additional supply required for necessary rehabilitation and rapidly developing infrastructure in California and Nevada,” said Steve Regis, Senior Vice President Corporate Services, CalPortland.

The project began in January 2018 and was constructed by general contractor ThyssenKrupp and sub-contractor TIC (The Industrial Company), in collaboration with CalPortland’s Engineering Services team.

The mill is a Polysius two compartment mill with production capability of around 180t/hr. It is equipped with motor, mill and separator technology as well as cement cooler design technology. The system also employs mechanical conveyance (bucket elevator) to convey finished product to the new silos, reducing its energy requirements. These additional systems are being added to the Oro Grande plant.

Published in Global Cement News
Tagged under
  • US
  • California
  • Plant
  • Upgrade
  • CalPortland
  • Mill
  • GCW397
  • ThyssenKrupp
  • Polysius
  • The Industrial Company
  • Conveyor

Related items

  • VAN cement plant begins operations in Iraq
  • Ramco Industries to build new fibre cement board plant in Madhya Pradesh
  • Back to the future: FLSmidth Cement becomes Fuller Technologies
  • NCL Industries commissions new Thallapalem grinding plant
  • Eagle Materials reports financial results for second quarter of 2026 financial year
back to top
We Move Industries - Heko Group - Conveyor Solutions
“Loesche
SR-MAX2500 Primary Shredder for MSW - Fornnax
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« November 2025 »
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global GypSupply
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.