Algeria: Groupe des Ciments d'Algérie (GICA) has officially recommissioned the 1Mt/yr Timegtane cement plant in Adrar after a period of closure. Sifi Ghrieb, the Minister of Industry, visited the plant to mark the occasion, according to Le Jeune Independent newspaper. The unit partially re-started production in March 2024. A second 1.5Mt/yr production line at the plant is due to be commissioned soon.
The government transferred the ownership of the plant to GICA as part of a reported state drive against corruption. It was originally inaugurated in 2017 as a joint-venture between local company STG Engineering and the China Triumph International Engineering (CTIE). Construction of a second production line at the site was previously reported in 2018.