
15 September 2021
Belarus targets 11Mt of peat production in 2021 - 2025 15 September 2021
Belarus: State-owned utilities provider Beltopgaz is targeting national peat production of 11Mt in the five-year period ending on 31 December 2025. BelTA News has reported that the new target is an outcome of an on-going comprehensive modernisation of peat production in the country. The 2021 peat season ended on 1 September 2021. During the year, Belarus produced 1.5Mt of peat, 14% of the five-year target.
The cement industry currently consumes 300,000 peat briquettes per year, 43% of the total produced nationally.
Fives performs remote commissioning to replace a burner at a cement plant in East Asia 15 September 2021
Asia: France-based Fives says it has commissioned a Pillard Novaflam Evolution burner for an unnamed cement plant in East Asia. Due to the travel restrictions linked to the coronavirus pandemic, the commissioning was carried out remotely with the cooperation of the customer. A 143MW coal and petcoke burner with oil as a start-up fuel was supplied as a replacement for an old burner. The aim of this replacement was to increase the kiln capacity to 9000t/day without impacting its NOx emissions whilst maintaining a good clinker quality despite a high sulphur content in the petcoke. The installation is now in production and an intervention is planned in the coming weeks to further optimise the operation.
Claudius Peters supplies conveyor and silos for Schretter & Cie’s Vils Cement plant 15 September 2021
Austria: Germany-based Claudius Peters has supplied a conveyor and silos for Schretter & Cie’s integrated Vils Cement plant in Tirol. In the first part of the project Claudius Peters Projects delivered an aeroslide conveying system from the cement mill to the existing silos, including silo bottom aeration systems. For the second part, it built a silo group consisting of three 3500m³ units with expansion chamber technology equipped with truck loading facilities. Each of the silos can be operated at a loading capacity of 250t/hr by a mobile loader with a travelling range of 10m.