Angola: Sinoma International has ordered Loesche's complete grinding series for the Nova Cimangola SA cement plant in Luanda, Angola. These will be the first Loesche vertical roller mills in the country.
The order includes one cement raw material mill of the type LM 48.4 with a capacity of 400t/hr and two cement mills of the type LM 46.2+2 C/S which are designed to have a capacity of 150t/hr each. Loesche's coal mill of the type LM 24.20 DC completes the order. Further equipment like rotary star feeders, metal detectors, the engineering for the cyclones, classifier motors and the control system are also in Loesche's scope of supply, as well as a two-year operation spare parts contract.
The coal mill and the cement raw material mill are scheduled to start operation in the middle of 2016. The cement mills will follow with a production start by the end of 2016.