Poland: LafargeHolcim has awarded a contract to A Tec to upgrade the chlorine bypass system at its Kujawy cement plant. A Tec will upgrade its existing Reduchlor bypass system to increase the rate to 10% from 5%. The upgrade will retain the system’s existing bypass filter and filter fan. The project will be commissioned in spring of 2017.
A Tec’s Reduchlor bypass system consists of a take-off chamber above the kiln inlet, specifically designed for each installation, and a specially designed quenching chamber, to which the chlorine condenses on and adheres to fine dust particles. After this condensation process the chlorine-enriched material is collected in a filter.