US: Lehigh Hanson has secured US$3.7m-worth of funding from the US department of energy for its planned front-end engineering design (FEED) installation of a carbon capture system at its Mitchell cement plant in Indiana. The funding was part of a total US$31m pot awarded to 10 different carbon capture projects across multiple industries. All of the projects have the capacity to capture over 95% of emissions from their respective plants.
Mitsubishi Heavy Industries America is supplying its carbon capture system for use at the Mitchell cement plant, at a total project cost of US$4.8m.