Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News US government grants US$3.7m in funding for Lehigh Hanson’s Mitchell cement plant’s carbon capture installation

US government grants US$3.7m in funding for Lehigh Hanson’s Mitchell cement plant’s carbon capture installation

Written by Global Cement staff 01 September 2022
  • Print

US: Lehigh Hanson has secured US$3.7m-worth of funding from the US department of energy for its planned front-end engineering design (FEED) installation of a carbon capture system at its Mitchell cement plant in Indiana. The funding was part of a total US$31m pot awarded to 10 different carbon capture projects across multiple industries. All of the projects have the capacity to capture over 95% of emissions from their respective plants.

Mitsubishi Heavy Industries America is supplying its carbon capture system for use at the Mitchell cement plant, at a total project cost of US$4.8m.

Last modified on 07 September 2022
Published in Global Cement News
Tagged under
  • US
  • Lehigh Hanson
  • Government
  • Grant
  • funding
  • Upgrade
  • Study
  • Trial
  • Investment
  • net zero
  • GCW573

Related items

  • Back to the future: FLSmidth Cement becomes Fuller Technologies
  • Holcim wins EU funding for Campulung carbon capture project in Romania
  • Carmeuse wins EU funding for LEOPARD lime decarbonisation project
  • N+P Group confirms investment in alternative fuel pilot line
  • Heidelberg Materials wins EU Innovation Fund support for four CCUS projects
back to top
We Move Industries - Heko Group - Conveyor Solutions
“Loesche
SR-MAX2500 Primary Shredder for MSW - Fornnax
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« November 2025 »
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global GypSupply
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.