Turkey: Limak has ordered a new 3500t/day clinker production line from KHD for its Trakya cement plant. Cement plant equipment manufacturer KHD has been contracted to deliver the equipment, supervise the construction and commission the project, including on-site training. The new kiln line will be erected near an existing 1850t/day line, which will also be upgraded by KHD in the beginning of 2014.
Core components of the new KHD line include: a four-stage KHD Preheater with PYROCLON®-R Low NOX calciner, equipped with PYROTOP® compact mixing chamber, tertiary air duct with dust settling chamber, and PYROBOX calciner firing system for coal dust; a PYRORAPID® two-tire rotary kiln, with a diameter of 4.4m; PYRO-JET® kiln burner for coal and fuel oil; PYROFLOOR® clinker cooler equipped with a PYROCRUSHER® System.
The new calciner with PYROCLON®R will be KHD's first Low-NOX calciner in Turkey. Trakya will be the second PYROFLOOR® system Limak has installed at one of its plants. Commissioning of the new kiln at Trakaya is scheduled for the autumn of 2014.