Malaysia: Christian Pfeiffer has received the order to erect a turnkey cement grinding plant, including silos and packing facility, for Caha Mata Sarawak (CMS) in Kuching, Malaysia. The related contract was signed on 23 June 2014. The Euro36m order comprises engineering, fabrication and supply of the entire equipment including electrical and control equipment, installation and commissioning of the grinding plant as well as the complete construction work and layout of roads. The grinding plant has a designed capacity of 1Mt/yr of cement.
The delivery includes a two-chamber ball mill with slide shoe bearing, two 10,000t silos, two big bag loading stations and a packing and palletising installation for truck loading with a capacity of 3,000 bags/hr. One of the silos is equipped with a one-chamber system. The other one with a two-chamber system. The specific energy demand of the entire grinding plant is less than 40kW per tonne of cement. The construction work will start in July 2014 and completion and commissioning are scheduled for summer 2015.