Displaying items by tag: Kiln
Shree Cement starts kiln at Baloda Bazar plant
15 December 2017India: Shree Cement has started up the kiln at its new 2.6Mt/yr Baloda Bazar plant near Raipur in Chhattisgarh. The unit is part of a US$900m investment plant to build three new plants with a total production capacity of 10Mt/yr.
ANCAP in row over spare cement kiln
19 September 2017Uruguay: The Administración Nacional de Combustibles, Alcoholes y Portland (ANCAP) is reportedly unsure what to do with a spare kiln it owns. The state-owned oil and cement producer purchased the US$80m kiln for its Paysandú cement plant, according to the Uypress news agency. At present the parts and components are stored at the site.
ANCAP’s union would like the kiln to be installed to secure cement supply at the plant. However, the company’s cement division has built up a debt of US$207m over the past 15 years and it is expected to make a loss of US$15m in 2017. The cement producer plans to cut 60 jobs and make savings of US$20m by 2019.
UK: Thermoteknix has announced the launch of its ThermaScope HD kiln and cooler camera Multi-View system at the Global CemFuels Conference 2017 taking place in Barcelona. The new measurement, recording and analysis system for Thermoteknix HD kiln and cooler cameras provides real time screen displays with picture-in-picture layouts to coordinate and continuously record video data and events. A user Interface (UI) has been introduced to maximise the image presentation and to carry out temperature recording, I/O, alarms and analysis in the background. Full OPC compliance gives integration to plant automation and control without the need for custom programming.
An updating time line provides access to past history allowing the user to scroll the kiln and/or cooler video backwards or forwards in time to review, recall or compare fuel changes and events in the pyro process. ThermaScope Multiview software allows the operator to navigate graphically through past events, viewing the kiln process as on-going and illustrated in the timeline.
Multi-View provides the engineer with the ability to trend prospectively or retrospectively any point or area in the image by placing tools on the live (or historic) image to show the effects caused by changes in operational parameters, fuel, combustion, kiln speed, or other factors affecting production and clinker quality.
India: Shree Cement has ordered a pyro-processing line with KHD for its Raipur plant in eastern India. The order follows the commissioning and handover of a previous KHD pyro-processing system that was installed at Raipur in December 2015.
The order includes: a three pier rotary kiln (Ø = 5.2m, L = 70.0m); a Pyrojet burner; a two-string, six-stage PRZ 9576 preheater; and a Pyrostep PSC2 3-135.12T clinker cooler. Commissioning for the Raipur Line II is expected in third quarter of 2017.
Tanga Cement to start building new kiln
31 May 2016Tanzania: Tanga Cement plans to build a new clinker kiln that will increase its clinker production capacity to 1.2Mt/yr from 0.5Mt/yr. The upgrade is expected to cost US$135m, according to East African Business Week.
“This additional capacity is expected to satisfy the consistent demand for cement from both the Tanzanian market and markets beyond the country's borders into the immediate future,” said Lawrence Masha, Tanga’s chairman of the board of directors, at the company’s annual general meeting.
IKN places order for A TEC GRECO kiln burner
14 April 2016Germany: IKN has placed an order for a A TEC GRECO kiln burner for the HeidelbergCement’s cement plant at Burglengenfeld. The project will be completed by the end of 2016. It is part of a general upgrade being conducted at the plant by IKN.
The scope of A TEC GRECO’s supply includes the engineering, design and manufacturing of a tailor-made combustion system including the required peripheral systems for operation. The burner thermal power will be 75MW. The burner is intended use with lignite, sewage sludge, refuse-derived fuel (RDF), diesel and solvents.
A TEC GRECO is a subsidiary of A TEC specialising in burners for kilns and calciners.
Lafarge moves to reach emissions targets with new kiln in Canada
04 December 2015Canada: Tony Levstik returned to Lafarge to pull the plug on the oldest piece of equipment at the Lafarge cement plant in Exshaw, Alberta, Canada. He was the first operator of the kiln when it was installed in 1975. He said that shutting it down was a lot easier than starting it up.
Kiln 6 is replacing kiln 4 as part of Lafarge's plant expansion project. The new technology will help to control dust and has fewer emissions. It will be approximately 30% cleaner with sulphur dioxide emissions, 75% cleaner with nitrous oxide emissions and have 25% less greenhouse gas emissions caused by combustion. The new kiln will also have better filter technology to help improve dust control. Kiln 4 used the gravel bed filter technology, which was prevalent in the 1980s and 1990s, but kiln 6 will have a state of the art bag house to collect dust.
"You can't make cement without using a lot of energy and these kilns that we're putting in are a lot more energy efficient, so we won't use as much fossil fuel, as much power to run the new plant," said Lafarge Plant Manager Jim Bachmann. "For a lot of reasons this is an exciting day." Kiln 6 will be operational in 2016.