Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Cemex to install supercritical CO2 waste heat recovery plant at Prachovice cement plant in the Czech Republic

Cemex to install supercritical CO2 waste heat recovery plant at Prachovice cement plant in the Czech Republic

Written by Global Cement staff 09 June 2021
  • Print

Czech Republic: Mexico-based Cemex plans to install a 2MW waste heat recovery (WHR) plant using supercritical CO2 (sCO2) at its Prachovice cement plant. The unit is intended to provide up to 8% of the plant’s electricity requirements.

The producer is part of a consortium studying new sCO2 WHR systems. The EU Horizon 2020 Industrial Heat to Power fund awarded Euro14m in financial backing to the consortium. The project is intended to demonstrate a cheaper and more flexible method of waste heat valorisation compared to the steam or organic rankine cycle approaches conventionally used in WHR.

Plant director Karol Czubara said, “The new sCO2 technology has a smaller footprint and higher operational flexibility than conventional power plant cycles, which produce power from turbines using water or steam.”

Published in Global Cement News
Tagged under
  • Czech Republic
  • Cemex
  • Plant
  • Upgrade
  • Waste Heat Recovery
  • CO2
  • Research
  • EU Horizon
  • GCW509

Related items

  • Furno and Maschmeyer announce strategic agreement to produce cement using recycled concrete
  • Boliden receives US$12.5m grant to scale low-carbon cement alternative
  • Bamburi Cement signs US$250m EPC contract with Sinoma for clinker plant in Matuga
  • Deccan Cements begins commercial production at Line 3 cement plant
  • My Home Cement orders Gebr. Pfeiffer mill for slag cement plant
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.