Smarter deducting - Longer filter life - CK World
Smarter deducting - Longer filter life - CK World
Global Cement
Online condition monitoring experts for proactive and predictive maintenance - DALOG
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
News Tan Thang Cement orders more integrated digital automation and electrical equipment from ABB

Tan Thang Cement orders more integrated digital automation and electrical equipment from ABB

Written by Global Cement staff 19 September 2018
  • Print

Vietnam: Tan Thang Cement has ordered additional integrated digital automation and electrical equipment from Switzerland’s ABB for a new 2Mt/yr plant it is building in Nghe An province. The order is a follow- up order to the initial automation and electrical systems delivery from ABB for this site, which is currently under construction.

The follow-up order includes a 110kV AIS Substation (Air Insulated Substation), with a SCADA (Supervisory Control and Data Acquisition) system based on ABB Ability System 800xA for Power Control, as well as telecommunications, and High Voltage primary and secondary equipment to support the electrical infrastructure. ABB will also deliver power transformers, distribution transformers, an Intelligent Motor Control Centre, Auxiliary Control Centre, Emergency Diesel Generator, DC power supply, various field devices and related commissioning services.

ABB’s initial delivery included ABB Ability System 800xA DCS (Distributed Control System) to integrate control, electrical and communication systems for optimal visibility into all processes for stable production and efficient use of raw materials and energy. It also included ABB Ability Knowledge Manager and Expert Optimizer software, as well as basic communication and electrical system infrastructure and equipment.

The project is scheduled to be commissioned in late 2019.

Last modified on 20 September 2018
Published in Global Cement News
Tagged under
  • Tan Thang Cement
  • Order
  • ABB
  • automation
  • Power transmission
  • GCW371
  • Vietnam

Related items

  • Autonomous robot dog Spot begins inspection work at Leimen cement plant
  • Emissions controls and more in South Korea, December 2025
  • Vestas receives order for 10MW wind project at Italian cement plant
  • Saman Cement orders second Gebr. Pfeiffer mill for plant expansion
  • Sagar Cement orders second Gebr. Pfeiffer mill for Dachepalle plant
back to top
Loesche - Innovative Engineering
AirScrape - the new sealing standard for transfer points in conveying systems - ScrapeTec
« December 2025 »
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        



Sign up for FREE to Global Cement Weekly
Global Cement LinkedIn
Global Cement Facebook
Global Cement X
  • Home
  • News
  • Conferences
  • Magazine
  • Directory
  • Reports
  • Members
  • Live
  • Login
  • Advertise
  • Knowledge Base
  • Alternative Fuels
  • Privacy & Cookie Policy
  • About
  • Trial subscription
  • Contact
  • CemFuels Asia
  • Global CemBoards
  • Global CemCCUS
  • Global CementAI
  • Global CemFuels
  • Global Concrete
  • Global FutureCem
  • Global Gypsum
  • Global Insulation
  • Global Slag
  • Latest issue
  • Articles
  • Editorial programme
  • Contributors
  • Back issues
  • Subscribe
  • Photography
  • Register for free copies
  • The Last Word
  • Global Gypsum
  • Global Slag
  • Global CemFuels
  • Global Concrete
  • Global Insulation
  • Pro Global Media
  • PRoIDS Online
  • LinkedIn
  • Facebook
  • X

© 2025 Pro Global Media Ltd. All rights reserved.