Germany/Russia: Intercem has been awarded new orders in Germany and Russia. In Russia it will supply a high-efficiency separator ICS 143, as well as the associated plant aggregates to a new cement plant. The high-efficiency separator, an in-house development manufactured in the company workshop, has a capacity of 115t/hr at 3000cm2/g acc. to Blaine and a total output of 258t/hr. The volume flow classifying air is 143.000m3/hr. The scope of supply also includes the engineering for the complete grinding plant as well as the supervision of the assembly and the commissioning of the components included in the delivery.
In Germany it will supply silos for Zementwek Lübeck’s grinding plant. The order includes a silo unit consisting of four steel silos with a capacity of 1200m3 each. In addition, the bulk loading and the complex cement conveying via air slides and bucket elevators leading over the complete area of the plant are part of the scope of supply. The scope of supply also includes the engineering and associated plant components, such as support structure, catwalks, filters, bucket elevators, return lines, electrical equipment, as well as building application and dispatch automation. Completion is scheduled for the third quarter of 2019.
The German engineering company has also won a contract to optimise a secondary fuel dosing system at a German cement plant.